
Project Overview
Award-winning cable-stayed bridge spanning 2,800 feet, connecting downtown to the emerging waterfront district. This iconic structure serves as both critical infrastructure and architectural landmark.
The Challenge
The project required spanning a major shipping channel while maintaining full river traffic during construction, all while meeting stringent seismic and wind load requirements.
Our Solution
We employed a balanced cantilever construction method with prefabricated deck segments, minimizing river closures. Advanced wind tunnel testing informed the aerodynamic design of the cable system.
Results
- National Engineering Excellence Award recipient
- Reduced commute times by 35% for 50,000 daily users
- Zero shipping lane closures during construction
- Designed for 100-year service life
Construction Timeline

Phase 1 / 4

Phase 2 / 4

Phase 3 / 4

Phase 4 / 4
Project Specifications
size2,800 ft span
duration42 months
towers2 x 350 ft pylons
capacity6 lanes + pedestrian/bike paths
Start Your Project
Ready to build something extraordinary? Let's discuss your vision.
Request Consultation