Riverside Bridge
Back to ProjectsInfrastructure

Riverside Bridge

Chicago, IL
2023
Illinois Department of Transportation

Project Overview

Award-winning cable-stayed bridge spanning 2,800 feet, connecting downtown to the emerging waterfront district. This iconic structure serves as both critical infrastructure and architectural landmark.

The Challenge

The project required spanning a major shipping channel while maintaining full river traffic during construction, all while meeting stringent seismic and wind load requirements.

Our Solution

We employed a balanced cantilever construction method with prefabricated deck segments, minimizing river closures. Advanced wind tunnel testing informed the aerodynamic design of the cable system.

Results

  • National Engineering Excellence Award recipient
  • Reduced commute times by 35% for 50,000 daily users
  • Zero shipping lane closures during construction
  • Designed for 100-year service life

Construction Timeline

Riverside Bridge construction phase 1
Phase 1 / 4
Riverside Bridge construction phase 2
Phase 2 / 4
Riverside Bridge construction phase 3
Phase 3 / 4
Riverside Bridge construction phase 4
Phase 4 / 4

Project Specifications

size2,800 ft span
duration42 months
towers2 x 350 ft pylons
capacity6 lanes + pedestrian/bike paths

Start Your Project

Ready to build something extraordinary? Let's discuss your vision.

Request Consultation